Wacker 0009098 Manuel d'instructions Page 22

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 64
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 21
Operation PT 3 / PT 3A / PT 3H
22 wc_tx001779gb.fm
4 Operation
4.1 Preparing the Machine for First Use
Preparing for first use
To prepare your machine for first use:
4.1.1 Make sure all loose packaging materials have been removed from the
machine.
4.1.2 Check the machine and its components for damage. If there is visible
damage, do not operate the machine! Contact your Wacker Neuson
dealer immediately for assistance.
4.1.3 Take inventory of all items included with the machine and verify that
all loose components and fasteners are accounted for.
4.1.4 Attach component parts not already attached.
4.1.5 Add fluids as needed and applicable, including fuel, engine oil, and
battery acid.
4.1.6 Move the machine to its operating location.
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 63 64

Commentaires sur ces manuels

Pas de commentaire